Every pump or dispenser goes through a thorough inspection, re-work, and testing to ensure it works perfectly when installed at your site. We make sure of this by performing the following procedures:
| 1. | Disassemble and replace worn parts. |
| 2. | Degrease and prime frame. |
| 3. | Check wiring and bring up to OEM specifications. |
| 4. | Replace worn gaskets, seals, and o-rings. |
| 5. | Install rebuilt meter(s) in most units. |
| 6. | Test electronic circuit boards and replace if necessary. |
7. | Install new filters. |
| 8. | Liquid pressure test each unit. |
| 9. | Check for leaks. |
| 10. | Check meter for calibration. |
| 11. | Replace instruction and price decals. |
| 12. | Replace outer panels with APS manufactured parts. |
| 13. | Crate or prepare unit for shipping. |
| 14. | Back each product with a 1-year parts warranty. |